Buchart Horn Architects (BHA) provided mechanical, electrical, and plumbing services for programming/feasibility, schematic design, design and bidding, and contract administration and project closeout phases for renovations to a 4,000-SF science laboratory in the Bachmann Building at Neumann College (NC).
During the program and feasibility phase, BHA surveyed the existing conditions, interviewed NC staff to determine the availability and condition of existing MEP service and systems, calculated demand on the existing MEP system, generated written report findings and recommendations on a room-by-room and systemic basis with a cost estimate, and actively participated in two programming/planning review meetings with NC.
During the schematic design phase, we developed calculations and selections for system demand and MEP components based on NC's own and our architectural program, generated a written schematic report on MEP systems with a cost estimate, provided recommendations for MEP systems, and actively participated in a schematic review meeting with NC.